| 1. | Each bundle of strands is connected to one side of the center web of the two cell box girder . 每束钢缆锚固在双箱梁的中间腹板的一侧。 |
| 2. | During fabrication slots for the stringers flanges were flame cut into box girders . 制造时,为安装纵梁翼缘,在箱型梁中用焰割法开槽口。 |
| 3. | The successful alternative was the cast-in-place segmental prestressed concrete box girder . 最后采用的方案是分段现浇的预应力混凝土箱形梁。 |
| 4. | The scheme is a transition between the box girder with vertical piers and the true arch . 该结构是具有垂直墩的箱梁桥钢与真正的拱桥之间的一种过渡形式。 |
| 5. | The box girders were to be precast units, bonded together in place at the joints with an epoxy resin . 箱梁采用预制构件,在现场连接处涂以环氧树脂,以粘结成为整体。 |
| 6. | In cross section the total deck width is 1158 ft with the torsionally rigid spine box girder having a width of 39 ft 4 in . 横断面上,桥面总宽1158英尺,其中具有抗扭刚度的脊骨箱梁宽39英尺4英寸。 |
| 7. | Model test of pc continuous curved box girder 预应力混凝土连续曲线箱梁桥模型试验 |
| 8. | Analysis of ultimate strength for box girder by marc 进行箱梁的极限强度分析 |
| 9. | Prestressing of post - tensioned prestressed concrete box girder 后张法预应力砼箱梁的预制施工 |
| 10. | Construction technique of asphalt paving on steel box girder deck 钢箱梁桥面沥青铺装施工技术 |